Going horizontal

Slowly we are moving from 2 meter vertical under the ground up to the horizontal beams. An immense amount of work of laying beds, then the steel rebar, al made on location. Then this gets boxed in and filled with more concrete. The main building was already around 20 trucks.
Next week the digging of the swimming pool starts and the sand is used to fill the space between the beams. We add the tubing, compact the sand and then the floor will be poured on top. On the side they are also working on the garage and workshop.
Below an impression of this phase.

Boxed in:

Then a day long filling with concrete with the smallest crane they could find:

A day later it’s all unboxed.

Related posts