  • Concrete steps

    Concrete steps

    12/04/2022
    Time has gone quickly and so did the build. We are still right on track with the planning. There is…
  • Guest rooms and pool

    15/02/2022
    The guestroom foundation has been done in a wink. Thanks to the crew working 7 days a week most of…
  • Tube-dance

    Electrics

    15/02/2022
    With the help of the family we started with the prep for the electrics before the floors can be poured.Large…
  • Water-tap

    Water-well drilling

    09/02/2022
    we needed our own water-well. Just dig a few meters and there is water but it might not be the…
  • Going horizontal

    21/01/2022
    Slowly we are moving from 2 meter vertical under the ground up to the horizontal beams. An immense amount of…
  • Footings

    Structural work has started

    11/01/2022
    In December 2021 we started the work, finally. Of course a lot of digging, metal work toe setup all the…
  • Lucky day

    15/12/2021
    Finally we came over to Thailand and started the build. One of the first steps is a ceremony called "Lucky…
  • House at night

    Settling in

    05/12/2021
    We moved in the Chalet. More work than expected to get a decent place build up from scratch but we…
  • Finally a signature

    29/11/2021
    After years of waiting and fighting we finally got our building permit signed. A big relief and also big thank…
  • Light at the end of the tunnel

    12/10/2021
    Finally after many years running into problems (we can not mention the names) and a lot of bureaucracy we are…