Concrete steps
12/04/2022Time has gone quickly and so did the build. We are still right on track with the planning. There is…Guest rooms and pool
15/02/2022The guestroom foundation has been done in a wink. Thanks to the crew working 7 days a week most of…Electrics
15/02/2022With the help of the family we started with the prep for the electrics before the floors can be poured.Large…Water-well drilling
09/02/2022we needed our own water-well. Just dig a few meters and there is water but it might not be the…Going horizontal
21/01/2022Slowly we are moving from 2 meter vertical under the ground up to the horizontal beams. An immense amount of…Structural work has started
11/01/2022In December 2021 we started the work, finally. Of course a lot of digging, metal work toe setup all the…Lucky day
15/12/2021Finally we came over to Thailand and started the build. One of the first steps is a ceremony called "Lucky…Settling in
05/12/2021We moved in the Chalet. More work than expected to get a decent place build up from scratch but we…Finally a signature
29/11/2021After years of waiting and fighting we finally got our building permit signed. A big relief and also big thank…Light at the end of the tunnel
12/10/2021Finally after many years running into problems (we can not mention the names) and a lot of bureaucracy we are…